(Before and After Photos)
JOB OF THE MONTH – ELECTRO BATTERY – MARYLAND HEIGHTS, MO:
The existing roof was a Spray Foam roof system that had failed. The Spray Foam was scrapped smooth and new fanfold insulation underlayment installed over it. A new 50 mil, mechanically attached “Duro-Last” Roof System was then installed over the fanfold. This roof system comes with a Manufacturer’s twenty-year nonprorated warranty for labor and materials.



