Posts Tagged ‘choosing a roofing contractor’
Thursday, September 17th, 2009
Airport Commerce Center – Waterford, MI

Airport Commerce Center - IB Roof System

Airport Commerce Center - Edge Detail

Airport Commerce Center - Walker Welder In Use
Tags: Airport Commerce Center, choosing a roofing contractor, Duro-Last, Green Roofs, Sustainable Roofing
Posted in Galleries | No Comments »
Thursday, September 17th, 2009
College View North – Adrian College (Custom Architectural Standing Seam Metal Work)

College View North Dormer

College View North Dormer
Tags: "Cool Roofs", Adrian College, choosing a roofing contractor, College View North, Duro-Last, Green Roofs, roofing contractors
Posted in Galleries | No Comments »
Thursday, September 17th, 2009
El Azteco Restaurant – 225 Ann St., East Lansing, MI

El Azteco Restaurant "Before"

El Azteco Restaurant "After"

El Azteco Restaurant "Before"

El Azteco Restaurant "After"
Tags: "Cool Roofs", choosing a roofing contractor, Duro-Last, El Azteco Restaurant, Green Roofs, Lansing Roofing, roofing contractors, Sustainable Roofing
Posted in Galleries | No Comments »
Thursday, September 17th, 2009
Mason Public Schools

Mason Public Schools "Before"

Mason Public Schools "After"

Mason Public Schools "Before"

Mason Public School "After"
Tags: "Cool Roofs", choosing a roofing contractor, Duro-Last, Green Roofs, Lansing Roofing Contractors, Mason Public Schools, Mason Roofing Contractors, roofing contractors, Sustainable Roofing
Posted in Galleries | No Comments »
Thursday, September 17th, 2009
Jackson National Life – 5913 Executive Dr. – Lansing, MI

Jackson National Life - Corporate Headquarters

Jackson National Life "After" Upper Roof

Jackson National Life "After" Entry Roof

Jackson National Life "After" Lower Roof
Tags: "Cool Roofs", choosing a roofing contractor, Duro-Last, Green Roofs, Jackson National Life, Jackson Roofers, Jackson Roofing Contractors, roofing contractors, Sustainable Roofing
Posted in Galleries | No Comments »
Thursday, September 17th, 2009
City of Adrian
The existing roof system consisted of a standing seam metal roof. New EPS insulation was installed between the metal panels and then a new Duro-Last Roof System was installed.

City of Adrian
Tags: "Cool Roofs", choosing a roofing contractor, City of Adrian, Duro-Last, Green Roofs, roofing contractors, Sustainable Roofing
Posted in Galleries | No Comments »
Thursday, September 17th, 2009
Federal Correctional Facility in Texas:
The existing roof system consists of a standing seam metal roof. ESP insulation was installed between the panels and a new Duro-Last Roof system installed.

Federal Correctional Facility "Before"

Federal Correctional Facility "After"
Tags: "Cool Roofs", choosing a roofing contractor, Duro-Last, Federal Correctional Facility, Green Roofs, roofing contractors, Sustainable Roofing
Posted in Galleries | No Comments »
Thursday, September 17th, 2009
Calvary Baptist Church – 825 N. Cochran – Charlotte, Michigan
The existing roof on the church building consisted of a layer of dimensional shingles. The roof pitch was too low for shingles and resulted in continuous problems with the shingle roof. Our solution was to remove the shingles and install a new Tan colored Duro-Last Roof System, mechanically attached to the deck. Ridge vent was used at the roof peaks to allow for proper attic space ventilation. The result was a aesthetically pleasing roof that provided all the church’s needs, complete with a Manufacturer’s 15-year Labor and Materials warranty.

Calvary Baptist Church "Before"

Calvary Baptist Church "After"

Calvary Baptist Church "After"
Tags: "Cool Roofs", Calvary Baptist Church, choosing a roofing contractor, Duro-Last, Green Roofs, roofing contractors, Sustainable Roofing
Posted in Galleries | No Comments »
Thursday, September 17th, 2009
Tecumseh District Library – 215 N. Ottawa Street – Tecumseh, Michigan
The existing roof system consisted of a ballasted EPDM membrane that was shrinking and tearing. The rock ballast and the top layer of EPDM membrane was removed. A layer of insulation was added and a new Duro-Last Roof System installed. The existing skylight curbs were too low to the roof line to allow for proper flashing. Our scope of work included raising the curbs and then flashing the curbs with prefabricated Duro-Last curb flashings.

Tecumseh Library "Before"

Tecumseh Library "After"
Tags: "Cool Roofs", choosing a roofing contractor, Duro-Last, Green Roofs, roofing contractors, Sustainable Roofing, Tecumseh Library
Posted in Galleries | No Comments »
Tuesday, September 15th, 2009
Bob Evans Restaurant – 23729 Michigan Avenue – Dearborn, Michigan
This project required a complete removal of the existing concrete covered foam insulation system before a new roof system could be installed. Working around the roof top units provided a difficult challenge. Prefabricated curb flashings by Duro-Last provided an easy solution for this challenge. New insulation was laid in place and then a complete Duro-Last roof system was installed. Pavers were then laid down on top of the Duro-Last membrane to provide access to the roof top units for servicing purposes.

Bob Evans - "Before"

Bob Evans - "After"
Tags: "Cool Roofs", Bob Evans, choosing a roofing contractor, Duro-Last, Green Roofs, roofing contractors, Sustainable Roofing
Posted in Galleries | No Comments »